WAGON - ITALY
Assembly of robotic line
Assembly of hydraulic press. Adaptation of robots with equipment. Installation of media.

MW LUBLIN - POLAND
Overhaul of the drive system of ERFURT 1250T press
Comprehensive overhaul of the entire system. Inspection of clutch-brake elements. Replacement of bearings and seals. Regeneration and replacement of worn components of the system. Verification of clearances in the kinematic system of the press.



POLMOTORS - POLAND
Disassembly of SCHULER 500T Press Flywheel
Replacement of flywheel bearings. Assembly using an induction heater. Analysis of the press failure cause. Restoration of proper press settings.




BRESCIA - ITALY
Assembly of ROVETTA 600T press
Comprehensive assembly of the ROVETTA press at the destination. Repair of the press kinematic system - replacement of damaged bearings. Commissioning and execution of the press workspace geometry.


EUROSTAMP - FRANCE
Repair of Rovetta 2000T Drive System
Disassembly of the drive shaft, clutch-brake system, and intermediate gears. Replacement of bearings and damaged components. Assembly and commissioning.




MA POLSKA - POLAND
Relocation of MECFOND D4 - 800 press
Comprehensive relocation of the double-acting MECFOND press. Disassembly and assembly of the press head using a hydraulic gantry. Alignment and leveling of the support structure under the press. Assembly and commissioning of the press.
SPARONE - ITALY
Installation of MULLER Hydraulic Press Line
Installation of the hydraulic press line along with the necessary media installations. Positioning, assembly, and commissioning. Due to the lack of a crane, all work was carried out using cranes.





STELLANTIS - France
Inspection of Schuler press line
Inspection of the kinematic systems of presses. Control measurements of workspace geometry of presses. Measurements of clearances of the crown, sliders, etc. Examination of pressing force.



CORNAGLIA - POLAND
Relocation of Rovetta 2500T transfer press
Comprehensive relocation of the press to a new facility. Due to the weight and size of the press crown, the drive system and kinematic elements were disassembled.




RENAULT - FRANCE
Replacement of four damaged screws and worm gears in the slide height adjustment system. Geometry alignment of the working area. Overload tests - press force test of Rovetta 2000T press.


SVECGROUP - SLOVAKIA
Assembly of BLISS hydraulic press
Due to the press location, all press components were installed through the hall roof. Installation of systems, alignment, and commissioning of the press.



MA - FRANCE
Repair of overload system for Rovetta 2000T press
Replacement of damaged hydraulic cylinder in the overload system. Disassembly of components, adjustment, installation, and commissioning.
DACIA - Romania
General overhaul of Schuler 400T presses
Replacement of kinematic systems with new ones. Modification of clutch-brake systems. Overhaul of overload and slider height adjustment systems. Disassembly of compensating cylinders and table lifting, replacement of seals. Replacement of slide guide liners. General overhaul carried out on two presses simultaneously within 4 weeks.







LAZ - ITALY
Assembly work using "skids"
Installation work based on technical drawings for the construction of transport skids for gas, electric, and oil turbines.